This replaces LMN 03/2026.
Port Users are advised that, following the completion of the post seabed-levelling survey at Berth 3, Port of Albany, the declared berth depths have been reinstated to the previous depth as detailed in the table below.
Masters, mariners, and stakeholders are requested to take note of the following declared depths and operate accordingly.
| Berth | Declared Depth | Minimum UKC |
|---|---|---|
| Berth 1 | 10.20m | 0.40m |
| Berth 2 | 10.20m | 0.40m |
| Berth 3 | 12.20m | 0.60m |
| Berth 6 | 12.20m | 0.60m |
| Channel | 12.60m | (dynamic ukc)1.20m or 10% of the deepest draft. Whichever is the highest. |
| Swing Basin (Berth 1 and 2) | 10.20m | |
| Swing Basin (Berth 3 and 6) | 12.20m |
Additional Instructions for Berth 1, 2, 3 and 6
Minimum UKC For Berth 3 and 6
The minimum UKC for Berth 3 and 6 is 0.60m. The Master is responsible for monitoring and maintaining the vessel's minimum UKC at all times.
Minimum UKC For Berth 1 and 2
The minimum UKC for Berth 1 and 2 is 0.40m. The Master is responsible for monitoring and maintaining the vessel's minimum UKC at all times.
All Masters, mariners, users of these berths can monitor the residual tide from Southern Ports Authority/Port of Albany website:
https://www.southernports.com.au/in-port/weather-maps-charts/albany-weather
Alternatively, if the above website is down, all users can monitor the residual tide from Department of Transport WA:
For further information, please contact the Harbour Master’s Office on this number 0488 929 095.
See relevant charts below.

